Isalko800 oil immersed transformerIn the face of different forms, different maintenance measures must be taken.

release time: 2022-05-20 14:45:55

For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.Isalko, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken if you work again, turn on the photo flash when it's light, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.dunedin ,The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.


Isalko800 oil immersed transformerIn the face of different forms, different maintenance measures must be taken.



How to reduce the failure of dry-type transformer?The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening ignition smoke, oil leakage, broken strand disconnection, hanging of dirty things, etching and turbidity which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side,IsalkoPower transformer oil immersed, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.ranking,Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding,IsalkoOil immersed transformer 1600KVA, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window,IsalkoTransformer series, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.


Isalko800 oil immersed transformerIn the face of different forms, different maintenance measures must be taken.



After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.Let's see,Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.Oil leakage of heat pipe radiatorIsalko,Oil leakage at electric welding positionThere are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.