Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Eden SalmiGrouting flower tubeHigh temperature, weak demand and falling prices

release time: 2024-03-28 01:27:16

The following aspects shall be paid attention to during the construction of grouting pipe: when the construction personnel are binding reinforcement and erecting formwork, reliable fixation measures must be taken for the buried grouting pipe to avoid displacement during concrete pouring and ensure the correct position of the grouting pipe in the concrete. When fixing the grouting pipe, only the allowable part of the grouting pipe can be perforated, and the body part shall not be damaged. The grouting pipe shall be fixed according to the construction specifications required by the design. The common fixing methods are: using additional reinforcement; Fixed with special fixtures; Fix with lead wire and formwork. No matter what fixing method is adopted, the grouting pipe must be positioned accurately, without damaging the effective part of the grouting pipe, so as to facilitate concrete pouring and tamping. During the construction of the grouting pipe, there are many sharp stones and sharp edged reinforcement in the concrete, so when pouring, vibrating and positioning the grouting pipe, so as to avoid piercing the grouting pipe due to excessive force.? The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall,Eden Salmi50lead small conduit, that is, there is an active gap. Therefore,The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the rotary drill is generally used for drilling the grouting hole. All grouting holes in the rock stratum are required to be cored for drilling, so as to find out the development and distribution of fractures in the rock stratum. The coring rate should reach -% in hard rock stratum and % in broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapses seriously, the mud slurry can also be used as the circulating fluid.The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.Canete, The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, the design modification requirements will be put forward only when problems are found in advance water stop during construction so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, which will affect the integrity and rationality of the whole water stop scheme.The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.


Eden SalmiGrouting flower tubeHigh temperature, weak demand and falling prices



After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits vibrators, etc.Features of reusable grouting pipe: with one-way switch . Good anti blocking property and no backflow of slurry. It is a thermoplastic material,Eden SalmiSupport small conduit,Eden SalmiSupport advance small conduit, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.device management,How heavy is a grouting pipe?When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe? The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.


Eden SalmiGrouting flower tubeHigh temperature, weak demand and falling prices



The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.Discount, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support. The installation is simple, fast and firm. At least one part of the grouting conduit buried in the concrete shall be firmly bound with the structural reinforcement; The length of the grouting duct leading out of the concrete shall not be less than mm; The leading end of the grouting conduit shall be set at a convenient and accessible position. No part of the grouting conduit shall be flattened or bent to avoid affecting the flow of grout. The opening end of the conduit shall be temporarily blocked to prevent foreign matters from entering. The damaged part of the grouting pipe shall be cut off, and the grouting pipe with the installed grouting pipe shall be re set at the cut-off part, and shall be overlapped with the original grouting pipe at both ends.When binding or welding reinforcement near the grouting pipe, temporary shielding measures shall be taken to protect the grouting pipe. The calculation of the reserved expansion amount of the grouting pipe and the bridge expansion joint changes all the year round. With the change of temperature and the change of vehicle live load, the bridge will shrink and deform. The grouting pipe and the bridge expansion joint play a major role at this time. The expansion amount of the grouting pipe and the expansion joint must be calculated accurately. The installation and construction of the grouting pipe and the expansion joint need to ensure the quality. We should select the model and type of grouting pipe and bridge expansion joint, and determine the installation time, installation season and temperature of grouting pipe and expansion joint. Calculate the large and small preload of grouting pipe and expansion joint.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Eden Salmi,Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme. The grouting pipe is specially used as a channel for the depth detection of pile foundation and for structural stress calculation. The grouting pipe is a small pipe, but this small pipe meets the standard sensitivity of sound reception. As long as there is a small sound, it can measure it and accurately reflect the data on the computer or sound receiver. During the concrete pouring of cast-in-place pile, a channel that allows the ultrasonic probe to be normally placed at the pile bottom is reserved, which is not considered in the structural stress calculation.The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms