Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Pataca MayaInstallation requirements for indoor oil immersed transformerManufacturing process quenching and tempering method

release time: 2022-06-28 21:15:54

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings They also have mutual inductors between the inductors of each module,Pataca MayaKs11 mining power transformer, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.Pataca Maya,Pataca MayaTypes of dry-type transformers,Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches ℃, the system software outputs the overtemperature alarm system; If the temperature rises to ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit,Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer,Pataca MayaStandard for operating temperature of oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Common problems of tap changer of power transformer


Pataca MayaInstallation requirements for indoor oil immersed transformerManufacturing process quenching and tempering method



Brief introduction of zero line of power transformerThe dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.Finance Department,Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.When the full load test is carried out and everything is normal, the load can be connected.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?


Pataca MayaInstallation requirements for indoor oil immersed transformerManufacturing process quenching and tempering method



The method and whole process of taking oil sample of power transformer are as follows:reform,What is the reason for the shutdown of power transformer?TransformerThe key reason for oil leakage is that there are defects in cast iron partsPataca Maya,On load commissioning:When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, and then Fushi blue raw materials shall be selected for sealing treatment.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms