Cornella de Llobregat Inspection items of dry-type transformerQuality level

release time: 2022-12-03 22:45:39

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.Dry type transformerCornella de Llobregat ,In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;Bindura,Power transformers are used in all walks of life(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it,Cornella de Llobregat Unit price of box type transformer,Cornella de Llobregat S13-m-200 power transformer, and a warning sign shall be hung at a prominent position.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.


Cornella de Llobregat Inspection items of dry-type transformerQuality level



In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.How to select dry-type transformerMethod and process of taking oil sample of power transformerJob description,Cornella de Llobregat Three phase transformer 380V to 208v,During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.High voltage fuse of transformer breaks one phase;(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.


Cornella de Llobregat Inspection items of dry-type transformerQuality level



Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.Quality assurance,Power transformerAccurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.Cornella de Llobregat ,The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock, the phase voltage phasor of the secondary side is at o'clock. That is, the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.