Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

PeterboroughPower transformer oil immersedThe function of the protective device

release time: 2022-06-27 10:03:33

resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line,PeterboroughRecovery of transformer cabinet, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group, when UAB and UAB overlap, the minute hand points to . & ldquo; & rdquo; in the new wiring group it is indicated by & ldquo; & rdquo.When the full load test is carried out and everything is normal, the load can be connected.Peterborough,Protection mode for type selection of dry-type test transformerIn the case of dry-type transformer operation, there is more noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.Ashdod,Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.


PeterboroughPower transformer oil immersedThe function of the protective device



Oil immersed transformer operationThe appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, so the usual load is KW, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Total quality assuranceIf the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.Careless maintenance and insulation damageSound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window,PeterboroughSingle phase oil immersed transformer,PeterboroughOil immersed transformer, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.


PeterboroughPower transformer oil immersedThe function of the protective device



Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well it will lead to common faults of oil leakage.Total quality management,The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.Transformer manufacturers generally adopt IP protective casing, which can avoid the entry of solid dirt with a diameter of more than mm, rats, snakes, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, IP protective casing can be adopted which can avoid being equally divided with the above IP protective effects However, IP casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.Oil leakage of cast iron partsPeterborough,Wiring mode of dry-type transformer:Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.Power transformer manufacturer

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms