release time: 2024-04-15 19:28:32

FatikariTransformer 500 box type,

Equipped with a temperature controller, platinum thermistor (pt) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.In the electric field of the winding to the yoke, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage,FatikariHow much is the 2000 box transformer, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.Fatikari,Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.Navahrudak,The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.


FatikariElectrical transformerYou are welcome to buy



When the transformer is put into operation if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications so as to promote the improvement of energy consumption level of transformer commodities.Protective measures for damping of dry-type transformerQuotation sheet,Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.


FatikariElectrical transformerYou are welcome to buy



Power transformer factoryInformation recommendation,When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.Fatikari,The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Power transformer plantUse fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.