the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Sanhe, it will lose control and engage in falling movements.If the elevator is already on the first floor immediately open the elevator door and enter the firefighter's dedicated state.Ar Riqqah,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).The requirement for the shaft is that it should not be plastered,SanheFixed lifting stage, which is beneficial for reducing noise, but there should be no protruding foreign objects.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.


SanheStage main lifting platformThe problem of incentive technology



The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Elevator Tip : Why elevators can trap people? Every elevator door on each floor has a safety switch, which can trigger the elevator to shut down in case of any abnormality. The elevator getting stuck is actually when the system detects an abnormal signal and triggers a protective device, like braking to stop.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Quality documents,Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business including: home elevator manufacturers


SanheStage main lifting platformThe problem of incentive technology



The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use,SanheAluminum alloy mast type lifting platform, try to obtain relevant data outside the shaft such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).High value,When the normal power supply is cut off, while there is still lighting inside the fire elevator.In daily life, elevators are a commonly used tool that brings us a lot of convenience. But how much do you know about the types and safety knowledge of elevators?The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.Sanhe,During the use of elevators, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies on the one hand, the maintenance technology and quality are guaranteed and on the other hand, if any problems occur, someone is also responsible.Restore the command button function in the cabin for firefighters to operate.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door,SanheElevating platform stage, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).