Check if the usage period of the speed limiter has expired. If it exceeds the usage period, it is necessary to send it to a qualified professional unit for inspection and calibration. What are the functions of the lifting stage device?Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope the crown wheel, and the counterweight steel wire rope bracketiron,According to GB/T-, when one of the following situations occurs in the curve related to the aging frequency, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the easier it is to damage the gears and racks.Khaniá,Check the relative orientation between the cable support wall and the cable guide frameOn the contrary, it should be adjusted in the opposite direction; When the meshing backlash of the gear pair is greater than .mm, loosen the connecting nut of the eccentric shaft of the guide roller and the tooth back pressure wheel as shown in , adjust the tooth back pressure wheel to press towards the back plane of the gear rack until the backlash reaches a reasonable range. Otherwise, it should be adjusted in the opposite direction. At this point, the guide roller should be loosened for o and then adjusted according to the adjustment of the guide roller.Check the safety interlocking equipment of the first cut door of the hanging cage


ironGuide rail vertical lifting platformHeavy positives frequently price ups and downs



Check the wear condition of the pinion and rack, please refer to the instruction manual for specific requirementsEmergency stop: Press the emergency button switch to raise or lower the machine.Attention: Abnormal meshing of gear teeth should be avoided: uneven rolling of the rollers should be avoided; Avoid diagonal orientation of the guide rollers; It should be avoided that the guide rollers are kept at the same time for a long time; The above abnormal phenomena can lead to rapid wear and even scrapping of gears, racks, rollers, and guide rails. If adjusted more carefully, it will be more beneficial for the service life of the elevator.Highly recommended,Ensure that the small gear and pressure wheel are securely fastened on the drive base plate and check the fixing condition of the drive base plate boltsThe frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting,ironCrawler folding arm lifting platform, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.Adjust and correct various safety doors and mechanical interlocking equipment


ironGuide rail vertical lifting platformHeavy positives frequently price ups and downs



Check and clean the driving gears and guide wheels of the elevator. If there is excessive wear, it is necessary to replace themInspection requirements,Check the smooth steel wire rope and various fasteners, if there is excessive wear, it is necessary to replace themOutbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.iron,Attention: Abnormal meshing of gear teeth should be avoided: uneven rolling of the rollers should be avoided; Avoid diagonal orientation of the guide rollers; It should be avoided that the guide rollers are kept at the same time for a long time; The above abnormal phenomena can lead to rapid wear and even scrapping of gears, racks, rollers,ironAluminum alloy automatic lifting platform, and guide rails. If adjusted more carefully, it will be more beneficial for the service life of the elevator.Check the safety interlocking equipment of the first cut door of the hanging cageCheck if the orientation of the upper and lower limit blocks on the guide rail frame is correct