The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.France,FranceVertical obstacle free lifting platform, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.Mariestad,Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.


FranceSingle and double column aluminum alloy lifting platformNews Quotation



The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesWill the elevator quickly fall during a power outage& mdash;& mdash; Some movies and TV dramas often mislead the public into thinking that if the elevator loses its power, it will lose control and engage in falling movements.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersProduct range,Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable, safe and reliable


FranceSingle and double column aluminum alloy lifting platformNews Quotation



The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Where is good,Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.When passengers are riding on the escalator, they may lose their balance and fall due to leaning against the skirt board on the side of the escalator, which does not move, but their feet move with the steps. Especially when carrying a lot of packages while taking the elevator it is more likely to fall on the escalator due to the inability to hold the handrail properly. So, when riding on the escalator, we must stand firmly and support it well, and do not lean against the skirt board on the side of the escalator.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.France,Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof,FranceCustomized household small elevator, high-temperature resistant, sturdy and durable, safe and reliableThe requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, and the site has not yet been constructed and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.