Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

polandVertical obstacle free lifting platformHigh industry efficiency

release time: 2024-04-17 01:10:34

Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.The call button on each floor is no longer working, and the call is cut off.poland,The elevator stops on a certain floor for a long time without moving or responding to external calls: it is possible that the elevator administrator has activated the driver operation function.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Lafiagi,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, and the site has not yet been constructed and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed,polandSecond floor household small elevator, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).


polandVertical obstacle free lifting platformHigh industry efficiency



The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesAircraft weighing tens or hundreds of tons in the elevator hangar are vertically lifted onto the airport runway  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.Promise and keep promise,If the elevator is already on the first floor,polandHome elevator villa self built house, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable safe and reliableMeasure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.


polandVertical obstacle free lifting platformHigh industry efficiency



The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Analysis project,The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.There are many similar situations in daily life, such as forcefully opening the door inside the car, causing the circuit to disconnect and forcing the elevator to stop, resulting in people being trapped. For example, if the elevator frequently enters and exits during decoration and falls into the crack of the door, the elevator hall door may not be tightly closed, and after several consecutive doors are opened and closed,polandHydraulic turnover machine, the elevator will stop. Professional quality assurance for home elevator manufacturers. Discount activities are underway, and new and old customers are welcome to come for consultationMeasure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.poland,Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Cleaning and cleaning of elevator car guide shoes. As is well known, the guide shoe runs on the guide rail, and there is an oil cup on the guide shoe. To ensure that the elevator does not make any noise during operation, it is necessary to regularly refuel the oil cup and clean the guide shoe, and the cabin should be cleaned thoroughly.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms