Create entry
World Encyclopedia  > category  >  Energy Encyclopedia   

AlpacaInstallation and construction price of cold storageWhat are the main advantages of

release time: 2024-04-17 08:17:02

In the process of realizing your dream, you must remove all the influences. It is very important to recognize that when these beautiful refrigerators are built in the villa room, the collection pit (pool) for flushing (thawing) and drainage should adopt the Countermeasures of avoiding freezing and cleaning and avoiding backflow of water.The construction of cold storage in site selection bears the circulation of low-temperature goods. Therefore, the transportation convenience of cold storage construction site should be given priority in site selection, such as proximity to roads, railways, the location of the cold storage should avoid large pollution sources and direct sunlight and the construction of the cold storage should have good drainage and ventilation conditions.Alpaca,Frozen and refrigerated storage begins to shift to shelf and pallet storage in accordance with & amp; amp; ldquo; FIFO & amp; amp; rdquo; This is conducive to improving the quality of commodity storage and reducing losses.The door of the combined cold storage is not tightly closed. Please adjust the distance between the hinge on the door and the door lock and the storage body.Tanta,AlpacaCold storage installation design engineering, - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse boards, so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel, and the two sets of connecting pieces shall be fixed on the upper, outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, it shall be about mm wide. If it does not meet the requirements, remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter, pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.


AlpacaInstallation and construction price of cold storageWhat are the main advantages of



The machine room of ammonia refrigeration system shall be equipped with exhaust assembly; The exhaust fan shall adopt anti motor. When the power supply is cut off due to unexpected refrigeration, it shall be able to ensure the reliable power supply of the exhaust fan. The overload protection of the exhaust fan should be applied to the signal alarm system without directly stopping the exhaust fan. The button box of the exhaust fan shall be concealed in the wall outside the ammonia compressor room.Ice cubes are always available in the cold storage. For small cold storage, the cost of using standby power supply or generator set is too high and the cost performance is low. In this case, some ice cubes must be always available in the cold storage. In case of power failure or refrigeration equipment failure ice cubes can be used to maintain the temperature in the cold storage.Goods are imported and exported frequently and the throughput is large according to the requirements of production and operationDirect material,Preparation, prepare the project planning of cold storage and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, transport all installation materials to the construction site, check the material quality and model, and start the installation of cold storage after confirmation.The polyurethane insulation board used in the construction of cold storage shall be integral and continuous, and there shall be no joint in the middle. The junction of polyurethane insulation board, top plate and ground shall be made into fillet arc for transition, which can well meet the health needs.The installation of top warehouse plate should be carried out alternately with the installation of wall plate, the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings,AlpacaFruit and vegetable cold storage installation company, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column, support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.


AlpacaInstallation and construction price of cold storageWhat are the main advantages of



When using the cold storage, try to keep the ground clean and professional cold storage installation,Honesty is the foundation,Fire retardant, flame retardant and high temperature resistant polyurethane is a kind of flame retardant self extinguishing material after adding flame retardant. Its softening point can reach more than ℃, and it will decompose only at higher temperature. In addition, polyurethane forms carbon deposits on the surface of the foam, which helps to isolate the foam below. It can effectively prevent flame spread.When the fresh-keeping warehouse is assembled as a whole, a gap shall be reserved with the wall and roof, the speed must be strictly guaranteed during the purchase and shipment of products. If the temperature of the medical cold storage is about degrees and the construction environment shall be clean.Precautions for purchase and shipment when using the medical cold storage project,AlpacaPrice of cold storage installation, the opening time must be strictly within minutes. If the temperature of the medical cold storage is left and right degrees, the opening time can not be too high, strictly within minutes.Alpaca,The quick freezing storehouse of vegetables and fruits is not suitable to use exhaust cooling, but use fan to supply air for refrigeration, because the gas in the quick freezing storehouse needs to be circulated and dispersed regularly to avoid carbon oxide poisoning caused by high concentration of carbon oxide in local areas. Therefore, in the quick freezing warehouse, the refrigeration equipment needs to be used together with the air conditioning equipment. The selection of refrigeration equipment is different from that of low-temperature freezer and ordinary quick freezing warehouse.Points of multi-storey cold storage: small, which can save land; When the storage capacity is the same, the surface area of the outer enclosure structure is smaller than that of the single-layer cold storage, so that the cold consumption can be reduced, the dry consumption of food can be reduced, and the machinery and equipment cost and operation and management cost can be reduced accordingly. At the same time, due to the saving of thermal insulation materials the civil construction cost per unit area is low and the investment cost is small; The multi-storey location can be reasonable, such as the cooling room can be used as the cold storage room, the attic on the top floor can be built into the ice making room, etc.For the ground insulation of large cold storage, we can that the ground insulation of medium-sized cold storage is more complex than that of small cold storage, and the ground insulation operation of large cold storage with larger warehouse area will be more complex. The common operations are as follows: first lay the ventilation pipe to prevent the ground from freezing drum cracking, then lay the XPS extruded plate (staggered laying is required when laying the extruded plate), then lay the moisture-proof and vapor barrier on the upper and lower sides of the extruded plate, then pour the reinforced concrete (generally at least cm thick), the XPS extruded plate is also laid according to the warehouse temperature. For example, the XPS extruded plate with thickness of ~ mm needs to be laid in the general low-temperature cold storage, while the XPS extruded plate with thickness of ~ mm can be laid in the high-temperature cold storage.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms