Create entry
World Encyclopedia  > category  >  Electronic Components Encyclopedia   

SvishtovGrouting pipeThe key to solving overcapacity

release time: 2024-04-18 14:02:30

Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe,SvishtovSteel pipe, pile foundation grouting pipe, grouting pipe manufacturer old brand, the pipe core and the outer wall of the pipe shall be washed clean.It is used to seal the construction joints price advantage and quality! Each time it is used up, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe,SvishtovPrecision tube, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

SvishtovGrouting pipeThe key to solving overcapacity


After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, especially the slurry stop plug.SvishtovGrouting pipeThe key to solving overcapacity2024-04-1814:02:30Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe,SvishtovGrouting pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

SvishtovGrouting pipeThe key to solving overcapacity


The secondary grouting pipe can only be grouted once and cannot be reused.After the grouting hole is drilled, install and lower the grouting pipe, mixer and other facilities in the hole.Svishtov,Taiz,The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms