release time: 2024-04-25 16:38:52

Check all standard sections and diagonal support connection points. Check the fastening bolts of the gear rack and ensure that the motor cooling wing plate and organization are cleanRegularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found,Emergency stop: Press the emergency button switch to raise or lower the machine.Check if the orientation of the upper and lower limit blocks on the guide rail frame is correctChakwal,Since the antirust paint on the exterior layer will actively react with the oxygen in the air, especially in the cold sun or rainstorm climate, so the exterior paint on the warehouse goods elevator will show signs of aging and then fall off every once in a while. Therefore, when maintaining the equipment of the lift table at ordinary times, pay attention to its storage, and try not to leave it outdoors, let alone in cool days or rainstormCheck the wear condition of the pinion and rack, please refer to the instruction manual for specific requirementsDrop test to check if the braking interval of the safety governor meets the requirements of the rules. Equipment transfer maintenance: Check the coupling between the electric motor and the worm gear reducer,seaportGuide rail type lifting platform for factory use,seaportAluminum alloy hydraulic lifting platform, and dismantle the gearbox. Clean all components and seals replace excessively worn and deformed parts and smooth oil


seaportAluminum alloy hydraulic lifting platformNew product



Ensure that power cables and electrical circuits are not damagedThe safety control voltage of is selected with rolling guide shoes, high accuracy, wear resistance, and stable lifting. The characteristics of the Jinchuang lifting platform are as follows: . There is no need for a machine room above the shaft. . The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. . The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, it can make the elevator emergency descend to the nearest floor position and open the door.Leakage occurs due to looseness, vibration, and the influence of heat on the sealing surface and pipe joints of the machine; Some casting, processing and other defects are difficult to detect during assembly and debugging, but due to vibration and impact during the operation process, these defects are exposed, manifested as oil (water) leakage. Therefore, leakage is prone to occur during the running-in period. Poor, due to the small fit clearance of newly assembled components and the difficulty in ensuring the uniformity of fit clearance due to assembly and other reasons, oil (grease) is not easy to form a uniform oil film on the friction surface to prevent wear. This reduces efficiency and causes early abnormal wear of the components. In severe cases, it can cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of faults.Inspection standard,Since the antirust paint on the exterior layer will actively react with the oxygen in the air, especially in the cold sun or rainstorm climate, the reaction speed will be accelerated, so the exterior paint on the warehouse goods elevator will show signs of aging and then fall off every once in a while. Therefore, when maintaining the equipment of the lift table at ordinary times pay attention to its storage, and try not to leave it outdoors, let alone in cool days or rainstorm  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, it shall order the immediate elimination of potential safety hazards in the production of construction elevators and cargo elevators discovered during the inspection. If safety cannot be guaranteed before or during the elimination of major production safety hazards, it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the investigation shall be serious, the rectification shall be resolute, and the results shall be consolidated.Use a feeler gauge to check the wear condition of the worm gear of the worm gear reducer. Please refer to the instruction manual for specific requirements


seaportAluminum alloy hydraulic lifting platformNew product



Use a feeler gauge to check the wear condition of the worm gear of the worm gear reducer. Please refer to the instruction manual for specific requirementsQuotation sheet,Drop test to check if the braking interval of the safety governor meets the requirements of the rules. Equipment transfer maintenance: Check the coupling between the electric motor and the worm gear reducer, and dismantle the gearbox. Clean all components and seals, replace excessively worn and deformed parts and smooth oilNow with the arrival of summer,seaportHydraulic boarding bridge mobile manufacturer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?Weekly maintenance: According to the operation instructions, ensure that the elevator is inspected and smooth every dayseaport,Quarterly maintenance: Check the items checked each month  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, the investigation shall be serious it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the rectification shall be resolute, and the results shall be consolidated.Regularly check all wires and cables for damage. Timely bandage and replace damaged parts.