Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

HongshanStage lifting platformTest items

release time: 2024-04-25 21:09:45

The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.Brick concrete structure elevator shaft: For unfinished brick structure shafts, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.Hongshan,The braking system of the elevator is usually closed, which means it is in the braking state when there is no power and only when it needs to be turned on, will the power turn on the brakes. So as soon as there was a power outage,Hongshan5-story household elevator small, cut off the power and the elevatorElectrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement,HongshanHydraulic barrier free elevator, operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable, safe and reliableKeling,Measurement of elevator and escalator shafts (III)The front room of the fire elevator is equipped with indoor fire hydrants.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.


HongshanStage lifting platformTest items



Measurement of elevator and escalator shafts (III)The elevator stops on the first floor and the door does not move: the fire emergency landing function of the elevator is triggered by smoke or thermal sensors inside the building.When the normal power supply is cut off, the lighting inside the non fire elevator has no power,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


HongshanStage lifting platformTest items



Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Highly recommended,If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.The elevator suddenly descends to the bottom floor and resumes normal operation: After the elevator is powered off and reconnected, the leveling reference position needs to be re determined.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Hongshan,HongshanStage lifting platform,Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, and door opening and closing of the elevator are all controlled by it, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward the elevator happens to run up or down to this point, and the hall door is shorted, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, with a large quantity and excellent quality at a reasonable price. It is fire-resistant, waterproof, high-temperature resistant, sturdy and durable safe and reliableDuring the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur, someone is also responsible.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms