Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

JinzhouElevating cargo elevator Elevating cargo elevatorThick and thin hair

release time: 2024-04-28 13:20:09

Many customers think that the operating power supply of the hydraulic lifting platform is below the safe voltage of V, and there will be no electric shock. They are wrong. Normally, there will be no electric shock, but if there is improper operation, it will still be very dangerous. So how can we effectively prevent the occurrence of electric shock accidents? Today the editor will share safety knowledge with you.Before the elevator manufacturer connects the motor to the elevator, please make the keyway of the motor shaft perpendicular to the tightening bolt. In order to ensure uniform force, please screw on the mounting bolts at any diagonal position first, but do not tighten them tightly, then screw on the other two mounting bolts at diagonal positions, tighten the tension bolts. All tightening bolts need a torque wrench to fix according to the marked fixed torque data and check whether the lift and lifting platform are used.How should we check the construction site of the construction hoist? you know?Jinzhou,Check before use Carefully check the grounding wire, safety device, buffer spring, etc. before use. Make sure it has a safe usage environment.Unscrew the screw on the dust-proof hole outside the flange of the elevator, adjust the PCS system ring to align the side hole with the dust-proof hole, and tighten the inner hexagon. After that, remove the motor shaft key.Santa Rita,The load of this series of products is divided into . to . tons, and can also be customized according to user requirements, with a load of up to tons.What kind of function can be achieved by installing the elevator? Before installation,JinzhouThree ton cargo elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of the parts connected to the motor and the elevator match. Here are the dimensions of the positioning boss of the motor, the input shaft and the groove of the elevator. Fitting tolerances.Frequently check whether the various mechanisms are operating normally and whether there is any noise. If a fault is found, it must be eliminated in time.


JinzhouElevating cargo elevator Elevating cargo elevatorThick and thin hair



It is strictly forbidden for personnel to take the freight elevator to go up and down floors and climb.The hydraulic system of the hydraulic boarding bridge has stable performance high quality, and is durable.Conscientiously write the special construction plan for installation and construction, and make safety technical disclosures to the installers.new product,Brake operators of various mechanisms on the equipment should regularly check and adjust the gap between the brake shoe and the brake wheel to ensure flexibility and reliability. Long-term promotion of freight elevator factory, price advantage, quality guaranteed!Guide rail lift (also known as freight elevator) is a non-scissor hydraulic lifting platform, restaurants, restaurants, warehouses, docks, workshops and other places that need to move goods vertically between high-rise buildings above the second floor. The low height is especially suitable for sites where the site is not suitable for digging pits. What problems do we need to pay attention to in these places where elevators are used?When installing,JinzhouLifting cargo elevator, dismantling and adjusting the slewing mechanism, care should be taken to ensure that the centerline of the slewing mechanism reducer is parallel to the centerline of the gear, the meshing surface is not less than %, and the meshing clearance is suitable.


JinzhouElevating cargo elevator Elevating cargo elevatorThick and thin hair



The wrong connection of the motor of the elevator When a coil,JinzhouOutdoor cargo elevator, coil group or one-phase winding is reversed it will cause a serious imbalance in the three-phase current and cause the winding to overheat.Total quality management,Unscrew the screw on the dust-proof hole outside the flange of the elevator, adjust the PCS system ring to align the side hole with the dust-proof hole, and tighten the inner hexagon. After that, remove the motor shaft key.It is strictly forbidden for two persons working at heights to use the same safety rope at the same time.The parts such as reduction box, gearbox, external gear and hydraulic oil are all in accordance with the requirements in the table.Jinzhou,Whether it is used outdoors or indoors, some small problems will inevitably appear after a long period of time. At this time, what we should do is to maintain and maintain the elevator. How to follow the steps correctly It has become a difficult problem, and I will answer it with you.The motor connection is wrong. When the delta connection motor is wrongly connected into a star shape, the motor still runs with full load, and the current flowing through the stator winding will exceed the rated current, and even cause the motor to stop by itself. If it overheats, it will burn out. When the star-connected motor is wrongly connected into a triangle, or the motor with several coil groups connected in series to form a branch circuit is connected in parallel with two branches, it will cause the winding and core to overheat, and in severe cases, the winding will be burned.It is strictly forbidden for personnel to take the freight elevator to go up and down floors and climb.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms