Create entry
World Encyclopedia  > category  >  Energy Encyclopedia   

GranadaInstallation price of large cold storageWhere is the general application

release time: 2024-05-06 07:08:56

The drainage at the outlet of the cooling fan, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, special personnel shall be assigned to ensure that the surface of the cold storage plate shall reflect evenly without condensation and cold running; Sealing conditions of joints and holes; Whether the warehouse door and delivery port are not tightly sealed, and timely deal with the problems of insulation and seal failure such as degumming and air leakage.Granada,After cooling down steadily, check all parts of the refrigeration system, exhaust pressure, suction pressure and exhaust temperatureThe product shade warehouse is a warehouse location below ℃ and the sun cannot be straight. The humidity is % ~ % relative humidity, and there are corresponding strict requirements for the wall, ceiling, ventilation, disinfection and epidemic prevention of the warehouse. The refrigeration system adopts full-automatic microcomputer electrical technology and does not need to be on duty. It mainly stores western and Chinese grass materials and instruments, and can monitor and record the temperature and humidity in the storage area.Qurghontepa,The temperature and humidity in the warehouse shall be kept uniform without movement; Try to finish the food in the warehouse at one time.There should be excellent drainage pipe standard around the warehouse,GranadaCold storage design quotation, the soil temperature should be low, there should be interlayer under the cold storage, and maintain good natural ventilation. Maintaining dryness is very important for the cold storage. In addition, before the construction of the cold storage, the tap water pipeline shall be paved and the FRP cooling tower shall be built.The installation of top warehouse plate should be carried out alternately with the installation of wall plate, and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column, support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.


GranadaInstallation price of large cold storageWhere is the general application



Frequently observe the operation state of the heart compressor of the cold storage equipment and its exhaust temperature. During the season change operation, pay special attention to the operation state of the system and adjust the liquid supply and condensation temperature of the system in time.Do a good job of power failure early warning. The management personnel of the controlled atmosphere storage shall often pay attention to the notice of the local power department. In case of power restriction or line transformation, they shall do a good job in time. For sudden power equipment failure and artificial line it is recommended to install power failure alarm, receive the alarm in time, and the loss will be reduced to a low level.The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage, medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection, loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in - days, The library body can be combined, separated or increased or decreased according to the needs of users.Recommendation and consultation,At ordinary times,GranadaInstallation of factory cold storage, which are different. For a long time, it provides various cold storage installation, cold storage construction, fruit preservation cold storage, medical cold storage on-site settlement, honest operation, and has offices all over the country for long-term cooperation. Different purposes, functions and designs, so what needs to be understood in cold storage design?Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, and the height width ratio of floor drain water seal shall not be less than mm. The elevator shaft, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.


GranadaInstallation price of large cold storageWhere is the general application



Features of quick freezing warehouse: the quick freezing technology is advanced, the frost free quick freezing method is adopted, the famous brand compressor and refrigeration accessories are configured, and the automatic frost is adopted. The method can only be used by microcomputer. The refrigeration system adopts green refrigerant, which belongs to the international advanced refrigeration technology in the st century.Respect for customers,The height of the warehouse, the horizontal and vertical of the warehouse shall be designed according to the refrigeration, refrigeration equipment, transportation and stacking conditions. The selection of insulation board is very important for Guangdong cold storage. At present, the vast majority of cold storage use polyurethane insulation board. What are the characteristics and advantages of polyurethane insulation board?Frequently check and determine whether the working voltage of switching power supply meets the regulations, and the working voltage shall be V & plusmn; %. When the wholesale of fresh-keeping warehouse equipment is not needed for a long time,GranadaPharmaceutical cold storage manufacturer, the main switching power supply of the freezing warehouse shall be disconnected, and it shall be ensured that the fresh-keeping warehouse equipment will not return to moisture and will not be polluted by other chemical substances such as ash.The drainage at the outlet of the cooling fan, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.Granada,Able to withstand the harsh local climate and its changes. Neither high temperature nor severe cold climate will cause irreversible damage or deformation to the external insulation system. The drastic change of the surface temperature of the external wall, such as the sudden shower after a long time of exposure, or shading during exposure, will not cause damage to the surface of the cold storage.The quick-frozen warehouse is easy to load and unload. All the plates and walls of the quick-frozen warehouse are produced by molds. You can choose tens of millions of products. Professional cold storage installation, installation of cold storage, cold storage construction, fruit preservation cold storage medical cold storage and transaction safety are guaranteed. Through internal concave convex groove connection, loading, unloading and handling are convenient. The installation period is short. Small and medium-sized cold storage can be delivered in - days, The library body can be combined, separated or increased or decreased according to the needs of users.Panel types of quick freezing warehouse: color plastic steel plate, salted steel plate, stainless steel plate, embossed aluminum etc.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms