PesackHousehold sightseeing elevatorWhat is the reason for the out of stock

release time: 2024-05-08 14:23:41

Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Pesack,The difference between home elevators and ordinary public elevators is that the focus of home elevators and ordinary public elevators is different, with some indicators significantly reduced. For example,PesackMobile aluminum alloy lifting platform, which is much lower than that of ordinary public elevators. Home elevators do not need to consider the issue of passenger flow, and the lifting speed is slower, ensuring safety. The lifting speed is generally between . to .m/s, and running smoothly.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.Radnevo,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Measurement of elevator and escalator shafts (III)


PesackHousehold sightseeing elevatorWhat is the reason for the out of stock



Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersElevator does not close the door or repeatedly opens and closes the door: there are debris blocking the light curtain or door contact plate at the entrance or sill.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Promise and keep promise,b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room,PesackStage boom elevator, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturers


PesackHousehold sightseeing elevatorWhat is the reason for the out of stock



The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled,PesackSmall household elevator, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.equipment maintenance ,The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Household elevators must be regularly maintained to confirm their safety and whether they can continue to operate, while also repairing any faults and hidden dangers found.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Pesack,The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, width and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.