Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

ManhattanAxle Co., LtdIndustry production efficiency improvement

release time: 2024-04-21 05:17:10

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is mm, mm, and mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.Manhattan,Features: Utilizing a sleeve type drag chain structure to achieve high-altitude operation with telescopic arms, the platform vehicle can achieve ° Rotating, both the work platform and the platform truck can be operated. The work platform truck can safely walk with the boom in any position,ManhattanDesign of boarding bridge, and the walking speed decreases with the rise of the lifting height.  . Before use,ManhattanMobile boarding axle hydraulic pressure, check the boarding bridge for obvious damage such as cracks and broken wires.Kyongju,Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.Open planning before placement makes it easy to clean up clutter.There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.


ManhattanAxle Co., LtdIndustry production efficiency improvement



Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.Straight arm aerial work platform vehicle.It is strictly prohibited to apply excessive pile loads around the foundation pit.offer,For slopes that are unstable or unstable after earthwork excavation top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from mm to mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is % higher than the market value! More than one ton is more expensive!There are three movable boards on both sides of the air conditioning board, LtdIndustry production efficiency improvement' >



It is strictly prohibited to apply excessive pile loads around the foundation pit.install,Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.The seat belt needs to be inspected every six months, with a load of kilograms. The test time is five minutes. After the test check whether the seat belt is broken or deformed, with complete designated products and guaranteed qualityCommon&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque,ManhattanRetractable boarding bridge, and be more robust than other channel structures.ManhattanAfter the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.The pressure on the axle will reduce the service life of the boarding axle.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms