Morel gonjiKs11 mining power transformerSales and profit are inversely proportional

release time: 2022-04-05 05:22:15

Morel gonji1000 dry type transformer manufacturer,

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Morel gonji,The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Afragola,Difference between dry-type transformer and oil immersed transformer:What is the wiring mode of dry-type transformer?Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.


Morel gonjiKs11 mining power transformerSales and profit are inversely proportional



When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.First of all, although dry-type transformer has strong moisture resistance,Morel gonjiPower transformer, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below %. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.In the electric field of the winding to the yoke, there must be a strong line breaking component so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.Good quality,Brief introduction of zero line of power transformerThe flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong,Morel gonjiS13-m-200 power transformer, so that the bolts are not tightened well, resulting in oil leakage.Protective measures for damping of dry-type transformer


Morel gonjiKs11 mining power transformerSales and profit are inversely proportional



According to the condition of cracks galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.Professional is king,If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Transformer inspection nose sniffing methodThe heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Morel gonji,If you want to check the activated carbon fiber for the hanging cover, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stabilize the bell cover, and check the bearing capacity of the lifting core, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, and has sound insulation and noise reduction.For no-load impulse closing of transformer which is resistant to corrosion and rust, pay attention to the following matters: