Create entry
World Encyclopedia  > category  >  Energy Encyclopedia   

VenezuelaManufacturer installing large cold storageThe price of is rising

release time: 2022-05-11 23:58:47

Polyurethane with good fire resistance and flame retardancy is a kind of refractory and self extinguishing material after adding flame retardant. In case of fire, it can be carbonized, which can effectively prevent fire spread. In particular, it can be sealed as a whole after systematic fire prevention treatment to form non combustible products.Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, and the height width ratio of floor drain water seal shall not be less than mm. The elevator shaft, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.Venezuela,This high-quality CA library not only wants to bring a certain effect in use, but also wants the hot air fan to reduce energy consumption in use. Every customer wants to achieve a better return with less investment. Therefore, today, I will introduce how the CA library can achieve energy-saving effect.Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt, drill a hole at the corresponding elevation in the middle of the plate width. When drilling, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels,VenezuelaRefrigerator manufacturer, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse, so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor, and check whether the top elevation of the wallboard can be correct. After the position of the wallboard is correct, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.Nakonde,With the development of the times, refrigeration devices are becoming more and more common. All aspects of life are inseparable from its use. Families will also be equipped with some simple refrigeration devices. For refrigeration devices such as cold storage, it is important to select materials with good thermal insulation. Cold storage is a better material selection, and manufacturers need to grasp its key points in the production process of cold storage.The cold storage shall be regularly overhauled and maintained, so as to reduce the failure rate of the refrigeration unit and achieve good refrigeration effect.The polyurethane insulation board used in the construction of cold storage shall be integral and continuous, and there shall be no joint in the middle. The junction of polyurethane insulation board, top plate and ground shall be made into fillet arc for transition, which can well meet the health needs.


VenezuelaManufacturer installing large cold storageThe price of is rising



During the installation of polystyrene storehouse the Perpendicularity Error of wall plate shall be corrected while the top storehouse plate is installed. The length of the top warehouse plate shall be mm shorter than the surface of the wall plate. After the installation of the top warehouse plate, the mm gap shall be marked with foaming material to ensure the sealing performance of the warehouse body.If the relative flow changes little, there is little difference in power consumption among several regulation modes, that is, the regulation mode has little impact on the energy-saving effect, or even does not save energy, but consumes more power due to the existence of the regulation device, and the variable speed regulation curve is close to the ideal curve. Therefore, the variable speed regulation mode is superior, it should be combined with the specific situation and comprehensive comparison. Generally speaking, the greater the regulation depth, the more significant the energy-saving effect.The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.manufacturer,On the basis of cold storage and preservation, the quick-frozen warehouse increases the regulation of gas composition, inhibits the respiration of fruits and vegetables, delays their metabolic process, better maintains the freshness and commercial quality of fruits and vegetables, and prolongs the storage period and shelf life of fruits and vegetables. Generally controlled atmosphere storage of fruits can prolong the storage period by & mdash; Three times or more. OK, what is the standard of quick freezing warehouse?First, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse boards, so as to make the boards closely close to each other. Two sets of connecting pieces shall be wedged between the wall panel and the wall panel,VenezuelaInstallation of large and small cold storage, and the two sets of connecting pieces shall be fixed on the upper outer and lower sides of the gap between the wall panel and the wall panel respectively. The lower connecting piece shall be as close as possible to the lower side, so that the post cast concrete can cover the connecting piece. After the gap between the plate and the plate ground is wedged with a connector, it shall be about mm wide. If it does not meet the requirements, remove the plate, trim the plate edge, and then reinstall it to make the plate joint meet the requirements. When fixing the adapter, pay attention to fix the two parts of the adapter on the edges of the convex and concave library plates respectively, and fix them with rivets. The spacing of the adapter should be able to tension the two library plates. When wedging the wedge iron, the hammer shall be perpendicular to the wedge iron to prevent damaging the warehouse plate. The ground wedge iron at the upper and lower parts shall be wedged at the same time, and the wedge iron shall be fixed with rivets.In order to ensure the safety of construction and cold storage operation, the span between the top storage plate supports (lifting points) shall comply with the following provisions: the polystyrene top storage plate (mm thick) has a very large span of M, and the polyurethane top storage plate (mm thick) has a span of m.


VenezuelaManufacturer installing large cold storageThe price of is rising



During the use of cold storage, attention shall be paid to the collision and scratch of the storage body to avoid the depression and corrosion of the storage plate, which will seriously reduce the local thermal insulation performance of the storage body.Application process,Cold storage, compressor overload,VenezuelaCold storage installation equipment, lack of refrigerant, low pressure too low, excessive air intake, in addition to paying attention to the planning of the above basic functions, KFC refrigeration suggests that enterprises can also configure the classification, scale, unpacking, packaging, etc. of large packaging, product portfolio packaging trademark, label pasting and supporting tools according to business needs, So as to better improve the quality of refrigeration distribution center and realize greater value return.Requirements for refrigeration equipment in quick freezing warehouse: the strict sealing of quick freezing warehouse is obviously different from that of ordinary quick freezing warehouse. Therefore, how to seal the refrigeration equipment is the key. First of all, all through wall pipelines must be equipped with sleeves, the frost flushing water return pipeline must be equipped with U-shaped bend water seal, and the main frost flushing and return pipeline outside the warehouse shall be equipped with air filling port to prevent the gas in the warehouse from being pumped out of the warehouse by negative pressure. In addition, due to the good sealing of the quick freezing warehouse, the set fluctuation range of the warehouse temperature should not be too large to prevent excessive positive and negative pressure from damaging the warehouse body.Venezuela,A large number of personnel are not allowed to select goods in the warehouse. Close the warehouse door in time. When the warehouse door is opened, pay attention to whether the air curtain is opened or the door curtain is placed properly. Turn off the lights when leaving the warehouse.Compression refrigerator is commonly used. It is mainly composed of compressor, condenser, throttle valve and evaporation pipe. The evaporation pipe is installed in the refrigeration warehouse. When the liquid coolant passes through the evaporation pipe, it directly absorbs the heat in the warehouse and cools down.Requirements for refrigeration equipment in quick freezing warehouse: the strict sealing of quick freezing warehouse is obviously different from that of ordinary quick freezing warehouse. Therefore, how to seal the refrigeration equipment is the key. First of all, all through wall pipelines must be equipped with sleeves, the frost flushing water return pipeline must be equipped with U-shaped bend water seal, and the main frost flushing and return pipeline outside the warehouse shall be equipped with air filling port to prevent the gas in the warehouse from being pumped out of the warehouse by negative pressure. In addition due to the good sealing of the quick freezing warehouse, the set fluctuation range of the warehouse temperature should not be too large to prevent excessive positive and negative pressure from damaging the warehouse body.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms