Create entry
World Encyclopedia  > category  >  Electronic Components Encyclopedia   

KotlajarfGrouting pipeThe volume shrinks obviously and continues to pull up

release time: 2022-06-28 13:30:26

● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, pile foundation grouting pipe, grouting pipe manufacturer, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.

KotlajarfGrouting pipeThe volume shrinks obviously and continues to pull up


The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe,KotlajarfSeamless pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.KotlajarfGrouting pipeThe volume shrinks obviously and continues to pull up,2022-06-2813:33:13It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe,KotlajarfPrecision tube, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.It is used to seal the construction joints, cold joints pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.

KotlajarfGrouting pipeThe volume shrinks obviously and continues to pull up


● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.Push the rock powder and sundries that are not washed, remain at the hole bottom,KotlajarfSteel pipe, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Kotlajarf,Corlu,The grouting mechanism includes filling grouting, and chemical slurry includes silicate (water glass) and high slurry. Silicification method compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, alkali solution method, high chemical grouting method and cement grouting method.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms