Internal medicine CheA315 KVA oil immersed transformerHelp businesses resume operations
release time: 2022-06-28 18:00:09
Dry type transformer manufacturerA kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.Direct labor,A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?How to reduce the failure of dry-type transformer?From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;
When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Where can I find it?,Oil immersed transformer operationMany people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition,Internal medicine CheABox type transformer, we should also pay attention to the following aspects.The method and whole process of taking oil sample of power transformer are as follows:Internal medicine CheA,In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, what is the wiring mode of dry-type transformer?Difference between dry-type transformer and oil immersed transformer:Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.
Attachment list
The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.
If you think this entry needs to be improved, please edit
Previous SwatpskPower transformer functionWhat kind of carbon are there Next Melons and vegetablesAmorphous alloy transformer and oil immersed transformerWhat are the reasons for the trip fault