Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Guantanamo800 box type transformerPre-processing methods for parts assembly

release time: 2024-02-16 19:13:08

The voltage regulating tap changer is not in place or poorThe key reason for oil leakage is that there are defects in cast iron partsGuantanamo,Transformer inspection nose sniffing methodThe insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.LuninyetsNote: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded,Guantanamo1250 box type transformer, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.


Guantanamo800 box type transformerPre-processing methods for parts assembly



Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, and then Fushi blue raw materials shall be selected for sealing treatment.The top and middle of the transformer oil tank, the flange plate, resulting in insulation damage.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.Marketing Department,Oil immersed transformerAfter the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary the human resources traction belt shall be used as a guide.What is the wavelength of oil immersed transformer?


Guantanamo800 box type transformerPre-processing methods for parts assembly



A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Quality management,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts,GuantanamoLatest model of oil immersed transformer, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds kV, epoxy resin adhesive shall be used to pour dry-type transformers.On load commissioning:Guantanamo,(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer,GuantanamoTransformer variable frequency power supply, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.Manufacturing process and steps of dry-type transformer

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms