PatosfatSeamless pipeDetection is
release time: 2024-03-29 16:20:50
The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method,PatosfatSteel pipe, install and lower the grouting pipe, grout stop plug mixer and other facilities in the hole.Patosfat,TaiyuanProcess flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.
Attachment list
The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.
If you think this entry needs to be improved, please edit
Previous Tai’an Dongpingautoclaved aerated concrete blockTeach you how to maintain Next ViennaStainless steel washing trough with washboardEconomic operation