Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

RohimnoPrice of advanced small conduitWhat is the application concept

release time: 2024-04-25 03:09:07

In limestone area, the punching is not good, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally,RohimnoSmall conduit support, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, When lifting and demoulding components, the concrete strength must meet the design requirements. The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.Toulon, The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe. Classification of grouting pipe grouting pipe the grouting pipe is a plane mesh material of grouting pipe with certain flexibility. The main raw material is polyethylene grouting pipe. It is extruded into thin sheets by a grouting pipe extruder, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material,RohimnoHollow self-propelled anchor rod manufacturer, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.The single liquid silicification method is applicable to reinforce collapsible loess with permeability coefficient of . ~ m/d and silty fine sand with permeability coefficient of . ~ m/d.Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.Interpretation and observation, It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!


RohimnoPrice of advanced small conduitWhat is the application concept



The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate,RohimnoAdvance support of small conduit, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Inspection standard Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides.Injecting grout into the embedded grouting pipe can seal construction joints, cold joints, pipe leakage and joints between the ground walls.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.Rohimno,A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding punching, shaping stretching, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, which will affect the integrity and rationality of the whole water stop scheme.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms