YakutskBasic structure of power transformerWhat to do if something goes wrong
release time: 2024-05-02 17:59:58
Common problems of tap changer of power transformerThis is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.Common problems of tap changer of power transformerTest results,Under normal conditions,YakutskEconomic operation of power transformer, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems so as to ensure the reliable and stable operation of machinery and equipment.What is the important role of power transformerDry type transformer factory
Power transformer factoryProcess inspection,Note: in the whole process of safety patrol inspection,YakutskS13 oil immersed transformer, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Transformer manufacturerThe iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Yakutsk,After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.Sound in case of phase failureFor the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.
Attachment list
The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.
If you think this entry needs to be improved, please edit
Previous Ridker Small elevator for conveying vegetablesWhere Next KemonaHydraulic aluminum alloy hydraulic lifting platformQuality inspection report