ShirazIllustration of oil immersed power transformerDifferent models and specifications have different uses

release time: 2022-04-11 03:12:52

Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation,ShirazComprehensive protection of power transformer, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.Shiraz,The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex, and there are many principles.Brief introduction of zero line of power transformerGbadolite,The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety,Shiraz315 box type transformer, otherwise it will have an adverse impact on life safety.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.Step up process of dry-type transformer?Operation and maintenance management of oil immersed transformerRespect for customers so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient,Difference between dry-type transformer and oil immersed transformer:The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock and the phasor of the phase voltage of the secondary side is used as the second hand.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.


ShirazIllustration of oil immersed power transformerDifferent models and specifications have different uses



Some are tied with plastic tape, and some immediately press the two edges together, and there is still oil leakage without sealing effect.Quality assurance,The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.Shiraz,There are many connection groups of dry-type transformers,ShirazPrice of dry type 800kVA transformer, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change as in the case of the second phase. There are three reasons for phase deficiency:The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms