Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia    Building Materials Encyclopedia   

variableOil immersed high voltage test transformerWhat are the components

release time: 2022-03-11 06:52:49

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at o'clock,variable1600KVA box transformer price, and the phasor of the phase voltage of the secondary side is used as the second hand.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.variable,Precautions for trial operation of power transformer manufacturersAfter no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.Camino Hotel,With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage and scientific and reasonable data method is selected, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.Difference between dry-type transformer and oil immersed transformer:When the transformer is out of phase, if the second phase is blocked, and there is sound when the third phase is sent; If the third phase is blocked,variableDry type transformer and oil immersed transformer, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:


variableOil immersed high voltage test transformerWhat are the components



When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Solenoid insulation deteriorationPromise and keep promise,variableLatest model of oil immersed transformer,The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.It will also produce many faults, effectively deal with various faults of oil immersed transformer make full use of the performance indicators and advantages of oil immersed transformer, and continuously improve the safety factor of oil immersed transformer. Ignition is a common fault of oil immersed transformer. The key fault of oil immersed transformer is short-circuit fault, and short-circuit fault is more general.


variableOil immersed high voltage test transformerWhat are the components



Seal oil leakageHigh quality and low price,Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.variable,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.When the full load test is carried out and everything is normal, the load can be connected.In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym