Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

niclol Grouting flower tubeVigorous development of processing

release time: 2023-02-01 14:37:00

The saddle shaped curved surface on the horseshoe surface of the grouting pipe and the upper and outer molds are not well fitted, which is caused by the Chengdu grouting pipe manufacturer&#;s failure to smooth (flatten) the grouting pipe along the horseshoe surface.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe, making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction spread the load stress evenly to a large base range, enhance the overall tensile strength of the soil, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.niclol ,The cement grouting method is applicable to the grouting of gravel layer and rock fissure. Ordinary portland cement is generally used, the water cement ratio is :, and % ~ % water glass can be added as the accelerator. Ordinary extrusion mortar pump is used for grouting, and the maximum grouting pressure shall not exceed MPa. For silty fine sand and cohesive soil with permeability coefficient less than -cm / s, split grouting can be adopted. The consistency of the cement slurry used for split grouting is large, and the water cement ratio is . ~ .. Flower tube method and one-way valve tube method are adopted for grouting. The maximum pressure of grouting is generally greater than MPa. It has good air tightness, low gas permeability,niclol Small conduit manufacturer, strong sealing and no leakage.Quilali,The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.Can the stretching speed of grouting pipe be defined?


niclol Grouting flower tubeVigorous development of processing



It is laid in the soil, and through the bite and interlock between the grouting pipe mesh and the soil, it forms an efficient stress transmission mechanism, so that the local load can quickly and effectively spread to the large area of soil, which changes the shortcomings of the ordinary grouting pipe, such as the small peeling force of the joint (n), the easy cracking of the welding point, the difficulty of construction, and the reduction of the role of side displacement prevention. Due to the change of material ratio and construction technology, which effectively changes the above shortcomings of the traditional steel plastic grouting pipe. Because of the protruding joints at the welding position, it is called convex joint steel plastic grouting pipe, and its academic name is node reinforced steel plastic grouting pipe. The steel plastic grouting pipe is made of high-strength steel wire (or other fibers) through special treatment, polyethylene (PE) and other additives, and is extruded to form a composite high-strength tensile strip. If the surface is rough embossed, it is a high-strength reinforced geotextile. This single belt is woven or sandwiched at a certain distance longitudinally and horizontally, and is formed by welding its junction with the fusion welding technology of special reinforcement bonding. The grouting pipe is set out from the inner ring tap in the vertical setting out state, and the drawn out pipe forms a spring shape and stretches automatically. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur.[] the beneficial effects of the utility model are as follows: the utility model is set in the grouting pipe, reduces the operation intensity of workers by using the lead screw principle, and reduces the quantities of clearing the roadway floor by using the rotary cutting in the casing pipe; The cutting depth can also be adjusted at will according to the actual situation of the roadway. The working efficiency is - times higher than that of manual cutting, which can greatly reduce the labor intensity of workers.Answer: Yes, but for a grouting pipe that has been designed, its elastic extension speed is certain.Project scope, The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken,niclol Small conduit support, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning,niclol Seamless small conduit, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. The length can be matched according to the construction requirements, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.discount, The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.(the density of steel pipe is kg/dm calculation formula: w = . (D-S) s where: W - theoretical weight of steel pipe per meter, kg / M; D - Nominal outer diameter of steel pipe, mm; S - nominal wall thickness of steel pipe, mm. It has good air tightness, low gas permeability, strong sealing and no leakage.niclol ,Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, or can not be placed at the bottom of the pile, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms