Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

San Severo Rotating lifting stageMaintenance and maintenance methods

release time: 2024-05-06 16:57:39

Measure the length, width, and observe whether there are grooves and embedded parts at the support beam.The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.San Severo ,When encountering abnormal elevator operation, you can call the repair hotline to consult with the maintenance personnel or inform the service center to handle it. Do not take unauthorized measures to avoid causing greater harm to the elevator or even causing casualties.To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.GbonganPlease note that there should be a space of over mm left on both sides of the escalator,San Severo Mobile aluminum alloy lifting platform, and when arranged in parallel, there is no restriction between the two escalators.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.


San Severo Rotating lifting stageMaintenance and maintenance methods



For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform and other parameters.When encountering abnormal elevator operation, you can call the repair hotline to consult with the maintenance personnel or inform the service center to handle it. Do not take unauthorized measures to avoid causing greater harm to the elevator or even causing casualties.Measure the length, width, and depth of the pit (if any) and observe whether there are grooves and embedded parts at the support beam.Industry management,The call button on each floor is no longer working, and the call is cut off.The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise but there should be no protruding foreign objects.Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.


San Severo Rotating lifting stageMaintenance and maintenance methods



The call button on each floor is no longer working, and the call is cut off.Recommendation and consultation,To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, the leveling reference position needs to be re determined.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters,San Severo Second floor household small elevator,The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long,San Severo Villa Home Elevator, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

If you think this entry needs to be improved, please edit

Previous Komarom Mobile reclaimerProduction Process    Next MassaFixed small lifting platformCheck after use

Synonym

No synonyms