Create entry
World Encyclopedia  > category  >  Electronic Components Encyclopedia   

DoloresSteel pipeThe bear market does not say the bottom, and the market downturn seriously affects the survival of enterprises

release time: 2023-05-23 05:27:42

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The secondary grouting pipe can only be grouted once and cannot be reused.

DoloresSteel pipeThe bear market does not say the bottom, and the market downturn seriously affects the survival of enterprises


After the grouting hole is drilled, grout stop plug, mixer and other facilities in the hole.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe,DoloresPrecision tube, steel flower pipe, advance small conduit high-pressure grouting pipe,DoloresSeamless pipe, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.DoloresSteel pipeThe bear market does not say the bottom, and the market downturn seriously affects the survival of enterprises,2023-05-2305:27:42● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)The secondary grouting pipe can only be grouted once and cannot be reused.

DoloresSteel pipeThe bear market does not say the bottom, and the market downturn seriously affects the survival of enterprises


● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious thin mud slurry can also be used as circulating fluid.Dolores,DoloresGrouting pipe,Xianxing,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms