Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Giorgio CalabriaCar mounted aluminum alloy lifting platformThe standard range of materials used

release time: 2023-06-02 03:36:52

How to maintain and maintain the stage? When using the lifting stage in daily life, Jinan Dasheng Hydraulic Machinery will introduce several maintenance and attention points for everyone: the brakes of each mechanism should be regularly inspected and adjusted for the clearance between the brake pads and wheels to ensure flexibility and reliability. On the friction surface, there should be no dirt present, and any dirt must be washed off with gasoline or thinner. Pay attention to checking each steel wire rope for broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. Professional elevator manufacturers have a complete range of products, which are popular both domestically and internationally. Our equipment has a long service life! The industry leader in product wire products, welcome to inquireEnsure that the small gear and pressure wheel are securely fastened on the drive base plate, and check the fixing condition of the drive base plate boltsGiorgio Calabria,The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.On the contrary, it should be adjusted in the opposite direction; When the meshing backlash of the gear pair is greater than .mm, loosen the connecting nut of the eccentric shaft of the guide roller and the tooth back pressure wheel as shown in , adjust the tooth back pressure wheel to press towards the back plane of the gear rack until the backlash reaches a reasonable range. Otherwise, it should be adjusted in the opposite direction. At this point, the guide roller should be loosened for o and then adjusted according to the adjustment of the guide roller.Palapye,Use a feeler gauge to check the wear condition of the worm gear of the worm gear reducer. Please refer to the instruction manual for specific requirementsMany times, after installing hydraulic cargo elevators in factories, floors, docks, and other places, there may be some adverse reactions and problems in the early stage. Below Yakali's editor summarizes some common problems with hydraulic cargo elevators and provides some statements on how to solve and prevent these problems.Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracket


Giorgio CalabriaCar mounted aluminum alloy lifting platformThe standard range of materials used



Check the smooth steel wire rope and various fasteners, if there is excessive wear, it is necessary to replace themJinchuang lifting platform product feature is mainly used for high-altitude cargo transportation between floors. With a load capacity of - tons and a lifting height of - meters, a guide rail elevator also known as a hydraulic elevator,Giorgio CalabriaMobile mechanical boarding bridge, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, and has a long service life. In case of power outage manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally cm-cm, and the top layer height is not affected, The pump station can be customized according to the on-site environment, suitable for - floors of steel structures or concrete factories. Both the internal and external parts can be used. The pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components . The oil cylinder is built into the platform . The heavy-duty steel wire rope wheel or weighted special chain ensures safety . The automatic insurance during the lifting process ensures vehicle safety . The synchronous device during the lifting process ensures that the vehicle may not overturn . The alarm setting before falling to the ground ensures the safety of the operator . The chain or steel wire rope fracture protection device . The hydraulic system pressure loss explosion-proof protection device . The elevator special flat permanent magnet switch is selected, The leveling effect is good. . The distance between heavy and empty loads is small, and the leveling accuracy is high. . Standard elevator boards, LCD display call boxes, relevant wiring harnesses,Giorgio CalabriaLarge mobile lifting platform, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.Check the fastening status of the wall bracket, support rod, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightenedProject scope,Organize, remove rust and repaint the structural components such as the suspension cage and guide rail frame for corrosion, and reinforce the severely corroded load-bearing membersEnsure that power cables and electrical circuits are not damagedCheck the safety interlocking equipment of the first cut door of the hanging cage


Giorgio CalabriaCar mounted aluminum alloy lifting platformThe standard range of materials used



  ?? When the construction supervisory department fulfills its safety supervision and inspection responsibilities, it shall order the immediate elimination of potential safety hazards in the production of construction elevators and cargo elevators discovered during the inspection. If safety cannot be guaranteed before or during the elimination of major production safety hazards, it shall be ordered to evacuate workers from the hazardous area or temporarily stop construction. In the work of hazard investigation and control, the investigation shall be serious, the rectification shall be resolute and the results shall be consolidated.Inspection basis, restaurantsTransfer of goods between floors of rooms, and restaurants. The low height is between -mm, especially suitable for workplaces that cannot excavate pits. And there is no need for upper lifting points, with diverse forms (single column, double column, four column), stable equipment operation, simple and reliable operation, economic and convenient goods transmission, and difficult to solve narrow spaces that cannot reach the requirements. A customized delivery platform can be created, and the product hydraulic system is equipped with anti fall, upper and lower door interaction, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point. The product has a sturdy structure, a large load-bearing capacity, simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The lifting stage device is mainly responsible for data processing of the operation mechanism and work bar of the vehicle, and is suitable for the electric control system of the self lifting stage lifting platform. The main sensors in the electric control system include angle sensors, long angle sensors, dual axis inclination sensors, and energy saving of the oil cylinder system.Jinchuang lifting platform product feature is mainly used for high-altitude cargo transportation between floors. With a load capacity of - tons and a lifting height of - meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise,Giorgio CalabriaPlatform type lifting platform, is convenient for maintenance and has a long service life. In case of power outage, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally cm-cm, and the top layer height is not affected, The pump station can be customized according to the on-site environment, suitable for - floors of steel structures or concrete factories. Both the internal and external parts can be used. The pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components . The oil cylinder is built into the platform . The heavy-duty steel wire rope wheel or weighted special chain ensures safety . The automatic insurance during the lifting process ensures vehicle safety . The synchronous device during the lifting process ensures that the vehicle may not overturn . The alarm setting before falling to the ground ensures the safety of the operator . The chain or steel wire rope fracture protection device . The hydraulic system pressure loss explosion-proof protection device . The elevator special flat permanent magnet switch is selected, The leveling effect is good. . The distance between heavy and empty loads is small, and the leveling accuracy is high. . Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.Lifting and loweringGiorgio Calabria, newly processed and assembled components have deviations in geometric shape and fitting dimensions. In the early stages of use, due to alternating loads such as impact and vibration, as well as factors such as heat and deformation, coupled with rapid wear and tear, it is easy to cause the previously fastened components to loosen.Check the oil level of the gearbox and make up for new oil if necessaryThe frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than % of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms