Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia    Energy Encyclopedia   

Samana Santa BarbaraWhere is it coldQuotation overview

release time: 2022-05-06 22:58:42

The butt joint between the top warehouse plate and the end of the top warehouse plate shall be treated to prevent air leakage and cold running. After all the top warehouse plates are installed, the butt joint shall be filled with foaming material, and the mm wide color steel plate shall be sealed at the butt joint with pull riveting.Energy saving and power saving: the design cost of quick freezing warehouse mentioned above is very low, but it has a great impact on the cost of quick freezing warehouse and later use cost. The electricity bill is often an important expenditure item in the later stage. The design scheme of the show can greatly reduce the power consumption of the quick freezing warehouse. The selection of the back sunny side of the quick freezing warehouse,Samana Santa BarbaraCold storage board cold storage installation, the selection of the thickness of the thermal insulation board should be appropriate, the tightness of the quick freezing warehouse door, and the temperature difference between the adjacent cold storage rooms should not be too large are all issues that we need to consider. There are also some tips, such as the use of air curtain machine on the quick freezing warehouse door. We remind users to use parallel units in quick freezing warehouse as far as possible and start them reasonably.Samana Santa Barbara,The high pressure gauge shall be installed at the opening of the liquid storage tank valve.Simple refrigeration is based on the volatilization of refrigerant in the condenser of the cold storage, so as to cool the refrigerant, and then input the refrigerant into the box or building of the refrigeration equipment to cool the air according to the heat exchanger. This kind of refrigeration has slow cooling speed, large total heat conduction temperature difference and complex system software, so it can only be used in less places, such as brine ice making and cold storage with constant temperature requirements.Newham,Compression refrigerator is commonly used. It is mainly composed of compressor, it directly absorbs the heat in the warehouse and cools down. - precautions for floor installation of cold storage: the floor shall be installed flat throttle valve and evaporation pipe. The evaporation pipe is installed in the refrigeration warehouse. When the liquid coolant passes through the evaporation pipe, the uneven part shall be leveled with materials and the locking hook between the plates shall be locked to ensure that the warehouse surface is flat without hollow feeling. (note that if this drainage system is installed outdoors in the north, the drainage pipe shall be insulated).Floor insulation of medium-sized cold storage the structure of medium-sized cold storage is what we often call the surface, that is, the top and wall are made of color steel plate / stainless steel with appropriate thickness of polyurethane and other insulation materials, while the ground needs to be insulated separately. At present, the common operations in the market are: laying the ground with XPS extruded board, laying moisture-proof and steam isolating SPS materials above and below the extruded board respectively, and then pouring concrete or reinforced concrete.


Samana Santa BarbaraWhere is it coldQuotation overview



More and more people begin to build cold storage, and most people choose to use cold storage for cold storage construction. Why? Why do people choose cold storage for construction? What are the advantages of cold storage? The following is a detailed introduction.For the installation of power distribution system, each contact shall be installed with wire number for maintenance.The ultrasonic town is a patented technology with a shaped energy cover,Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, and the height width ratio of floor drain water seal shall not be less than mm. The elevator shaft, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.During the use of the goods yard medical cold storage project, the stored goods must be in strict accordance with the relevant regulations. The goods should have a certain distance from the ground and wall of the cold storage. When stacking, the distance between the goods and the goods must be cm. At the same time, the distance between the goods and the cold fan should also be cm. No goods can be stored within this range, This is also an important content in the use of medical cold storage engineering.The construction of cold storage in site selection bears the circulation of low-temperature goods. Therefore, the transportation convenience of cold storage construction site should be given priority in site selection, such as proximity to roads, railways etc. At the same time, the location of the cold storage should avoid large pollution sources and direct sunlight and the construction of the cold storage should have good drainage and ventilation conditions.


Samana Santa BarbaraWhere is it coldQuotation overview



Application of parallel compressor in cold storage: the requirement of refrigeration capacity is large, and to refrigeration compressors under Malige need to be used on weekdays; Long term operation, and have strict requirements for temperature and humidity.demand, - floor installation of cold storage: first level the floor, then install the floor, select a beautiful floor and put it in a conspicuous place,Samana Santa BarbaraQuotation of cold storage,Samana Santa BarbaraHow to install the cold storage unit, and do a good job in the floor and evaporator drainage system.An air duct is generally set in the vegetable cold storage. The air flow from the upper air duct mouth blows to the wall and the lower product line, returns to the middle, is absorbed by the lower part of the evaporator, and the evaporator drains and returns to the air duct again.When opening and drilling is required for the top warehouse plate or wall plate, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, and the opening and drilling shall be carried out after review; The inlet hole, liquid inlet hole, return hole, water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets, with a spacing of mm and mm outside.Samana Santa Barbara, the stored goods must be in strict accordance with the relevant regulations. The goods should have a certain distance from the ground and wall of the cold storage. When stacking, the distance between the goods and the goods must be cm. At the same time, the distance between the goods and the cold fan should also be cm. No goods can be stored within this range, This is also an important content in the use of medical cold storage engineering.Thermal insulation rigid polyurethane has low thermal conductivity and good thermal performance. When the density of rigid polyurethane is ~ kg / m, the thermal conductivity is only . ~ .w / (m.k), which is the lowest among all thermal insulation materials at present.During production in the production workshop, the unit weight of Pu warehouse board shall not be less than the unit weight required by the project, not less than & plusmn; kg/m.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms