Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Palais de VersaillesGuide rail elevatorAnalysis of specific production steps

release time: 2024-04-15 18:50:24

Palais de Versailles10 meter hydraulic lifting platform,

Unique design; Work; The steel frame can withstand average pressure, effectively reducing the torsion of the frame, and has stronger durability.For the safety performance of high-altitude work platforms, it is necessary to have production technology,Palais de VersaillesManufacturer of scissor lift, scientific processes, and strict management to ensure production. When in use, the environment, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.Palais de Versailles,The cleaning of the elevator manufacturer requires that all parts of the elevator should be kept free of oil sludge, dirt and dust, especially the air fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, which has also become the planned expected maintenance system.Hydraulic boarding axle; Streamline” The open hinge joint design increases the welding area by more than three times compared to ordinary tubular joints, effectively extending the service life and simplifying maintenance.Redcliff, clean it with compressed air tighten the joint and remove the oil filter. After cleaning, and then return it to the oil tank and connect the pipeline.Motor does not rotate: The motor is broken, and the manufacturer will handle it. We are a long-term manufacturer of scissor type elevators. Welcome to inquireRegular inspection and maintenance, eliminating hidden dangers and troubleshooting are beneficial for improving work efficiency, extending equipment service life, and ensuring the safety performance of elevators.


Palais de VersaillesGuide rail elevatorAnalysis of specific production steps



Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.What should I pay attention to when starting a new mobile elevator? High priced and various specifications of scissor lift manufacturers welcome scrap merchants, industrial companies, enterprises, and power departments to visit and negotiate with the company!management,The lifting force of the scarifier is not strong or the lifting force is weak: the pressure regulation of the overflow valve does not meet the need to adjust the pressure to the required value; Refer to cleaning item above for leakage in the oil cylinder; The directional valve is stuck or leaking internally; The oil level is too low, and the oil inlet filter is blocked; The fuel supply pump has drawbacks; Check the wear and tear of the one-way valve core and valve seat, and check if the one-way valve spring is tired or deformed.What are the advantages of installing a guide rail type elevator for goods? The advantages of civil engineering are easy to install: there is no need for a machine room above the shaft, and the top layer can be installed at a height of more than meters. The computer room can be located within a radius of meters of the shaft, occupying an area of only - square meters. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirement for the shaft is low. A brick structure or brick concrete structure shaft is sufficient.What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC/ models, first install the suspension cage before installing the drive plate).


Palais de VersaillesGuide rail elevatorAnalysis of specific production steps



Are there any damages to the wires and cables of the department. We need to quickly bandage and replace the damaged department.Process inspection,Regular inspection and maintenance, eliminating hidden dangers, extending equipment service life, and ensuring the safety performance of elevators.When installing, disassembling, and adjusting the exhibition organization, attention should be paid to ensuring that the center line of the exhibition organization reducer is parallel to the center line of the gear, and its meshing surface is not less than %, and the meshing interval should be appropriate.The equipment operation is very simple, just press the operation button, and the height adjustment board of the equipment will automatically rise; Release the button, adjust the weight of the plate to fall, and the tongue plate can be used by placing it on the truck.Palais de Versailles,Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory, and random adjustment can easily cause internal pressure to increase or decrease. In severe cases, it can shorten the service life of the motor.Loose motor fixing screws: When the motor fan rotates, there is a sound. If the screws fixing the motor are loose, coupled with the vibration of the motor itself the motor collides with other components, resulting in a sound; The joints of each pin shaft are dry, lacking oil, and there is hard friction between the iron parts, which not only damages the components but also produces abnormal noises. Therefore, the editor should emphasize again that timely maintenance and frequent refueling are important; If the hydraulic lifting platform does not rise, there is air in the hydraulic oil. You can open the exhaust hole, add gas, and then tighten it again; Hydraulic oil solidification: replace the hydraulic oil; Oil leakage: Check if there is any oil leakage at the interfaces of each oil pipe. If there is any oil leakage, replace it in a timely manner; Motor reversal: Check for wiring errors; (Manufacturers of hydraulic lifting platforms who do not understand electricity in a timely manner)Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform,Palais de VersaillesSelf hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, please reinforce or replace them in a timely manner to avoid accidents.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms