TaiyibaSupplied by dry-type transformer manufacturerComprehensive performance analysis

release time: 2022-04-10 08:59:29

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak,TaiyibaPrice of recycled dry-type transformer, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.Due to poor sealing, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Taiyiba,The domestic transformer market is slowGradually, high-frequency vibration damping mechanical equipment,TaiyibaPower transformer test report, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Location This Zalafah,Power transformer factoryPower transformer manufacturerFault judgment of power transformer


TaiyibaSupplied by dry-type transformer manufacturerComprehensive performance analysis



The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise,Taiyiba16 kV Transformer, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However because of certain necessity, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex, and there are many principles.The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?Quality AssuranceOil immersed transformer companyFalling foreign matters and piercingOn load commissioning:


TaiyibaSupplied by dry-type transformer manufacturerComprehensive performance analysis



The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.Credit guarantee,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.Precautions for trial operation of power transformer manufacturersLoose core screwTaiyiba,The no-load impulse closing working voltage shall not exceed % of the working voltage marked on the gear of the transformer, the closing frequency shall be times, the delay time after power receiving shall not be less than min, and the time interval of each closing shall not be less than min.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, it can be transferred to on-load operation, % and % by grade.