Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Wright KennyElectric belt elevatorHow to balance the work elements

release time: 2024-04-24 14:17:02

with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern

Construction electric elevators outside the lightning protection rangeThe function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.Wright Kenny,When a single steel wire rope is excessively stretched,News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged,Wright KennyTwo phase electric elevator, making the further development of lifting platform vehicles possible.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.


Wright KennyElectric belt elevatorHow to balance the work elements



Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.recommend,Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.


Wright KennyElectric belt elevatorHow to balance the work elements



The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.Installation materialsDrainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).Mobile electric elevators are divided into: four wheel mobile lifting platform, two wheel traction lifting platform, car modified lifting platform, manual lifting platform,Wright KennyAll electric small elevator, manual lifting platform, and AC/DC dual purpose lifting platformThe entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.Wright Kenny,Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descentThe hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms