The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc.,Installation position of upper limit switch: Under normal working conditions, the distance between the upper limit switch and the upper limit switch is .m for SC type construction electric elevators, and .m for SS type construction electric elevators (person)Implementing multiple shifts of homework should fill in and submit records according to regulations.Pesack,MessinaMicro electric hoist,Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve,MessinaDedicated electric elevator, it is necessary to first turn the handle to turn the plug to a degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.Setting requirements: Before starting work every day and changing shifts the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.The entrance of each landing platform must be equipped with a landing door, and the door bolt must be set on the side next to the construction electric elevator.


Messina6-meter electric elevatorDesign and selection



The verticality of the guide rail frame should meet the requirements of the specifications.Items and other miscellaneous items.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.management,Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.The setting of the cable guide frame should comply with the user manual and regulatory requirements.


Messina6-meter electric elevatorDesign and selection



The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.total cost,The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.High altitude operations and maintenance in areas such as repair logistics, electricity, transportation, petroleum, chemical, hotel, sports center,MessinaElectric guide rail elevator, mining, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic liftingSetting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.Messina,Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.With the continuous improvement of urbanization level in China the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public