Darbus Grain hydraulic flipperHow to carry out special inspection work
release time: 2024-03-28 19:28:31
“& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth,Darbus Stage hydraulic lifting platform, top floor height reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.The elevator suddenly opens the door and does not move after leveling, but automatically resumes operation after a few minutes: The elevator (escalator) has been running for too long, and the motor overheats. To prevent burning out, the motor cools down and automatically resumes operation. “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width etc.), then consider the non-standard design of the elevator.agent,The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and the call is cut off.Total quality management,Darbus Stage elevator,The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.If there is a reserved shaft in the villa residential area, the appropriate car model can be selected by comparing the width and depth of the elevator car based on the size, width, and depth of the shaft. If there is no reserved shaft, you can first choose the model of the elevator and create a new shaft based on the required reserved size space for different models.The call button on each floor is no longer working, and the call is cut off.Darbus ,The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft
Attachment list
The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.
If you think this entry needs to be improved, please edit
Previous Darbus Aluminum alloy automatic lifting platformmanufacturer Next FengzhenConstruction site elevatorProfessional production