Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

Zory Hydraulic fully automatic plate rolling machineOn-site management method of production workshop

release time: 2024-04-24 20:16:02

The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.b. When the old elevator cannot start: due to the inability to enter the shaft, the plane size of the shaft can be measured in the machine room, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions,Zory Household sightseeing elevator,Zory Aluminum alloy mast type lifting platform, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Zory ,Zory Fixed stage elevator,Passengers wearing long skirts and strapping sandals when riding on the escalator should try to stand slightly in the middle of the escalator to prevent shoes and clothing from being drawn into the escalator and causing danger, and to prevent skirts or pants from getting stuck.The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.InkhilTo implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


Zory Hydraulic fully automatic plate rolling machineOn-site management method of production workshop



The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Elevator does not close the door or repeatedly opens and closes the door: there are debris blocking the light curtain or door contact plate at the entrance or sill.The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.agent,Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


Zory Hydraulic fully automatic plate rolling machineOn-site management method of production workshop



The front room of the fire elevator is equipped with indoor fire hydrants.project,Electrical safety. Faulty elevators have multiple safety devices, but there are also many places where problems can occur. Some people have been caught due to abnormal door opening and closing, making it difficult to see the floor clearly. Some have experienced the danger of falling straight several floors. Although there may not have been any personal injury, taking the elevator is not about finding or acting in a movie. The real life is disturbed by the frequent elevator accidents, which make my heart feel uneasyThe elevator suddenly descends to the bottom floor and resumes normal operation: After the elevator is powered off and reconnected,Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms