CassimbaskaPower system transformerProduction steps and inspection requirements

release time: 2023-03-21 04:14:41

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.The switching power supply lacks one phase of power;Cassimbaska,The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Mariara,The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.What is the wavelength of oil immersed transformer?The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.


CassimbaskaPower system transformerProduction steps and inspection requirements



If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm,CassimbaskaInrush current of dry-type transformer, stop the lifting stabilize the bell cover, and check the bearing capacity of the lifting core center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.How is the quality level of dry-type transformer compared with foreign countries?Sound in case of phase failureLatest quotation,What is the wiring mode of dry-type transformer?When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet and then take the oil sample.The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged,CassimbaskaHow much is a box transformer, the iron core causes large vortex,Cassimbaska3150 power transformer, resulting in heat, temperature rise, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.


CassimbaskaPower system transformerProduction steps and inspection requirements



What about oil immersed transformer fire?Discount,Oil leakage at electric welding positionThe appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, two pumps are started separately, and each pump is driven by kW motor, CST = . One kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only %When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.Cassimbaska, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;