Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

LibertaborgGrounding resistance of distribution transformerPrinciples of Industry Allocation

release time: 2022-12-04 09:26:15

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?Libertaborg,The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, AC,LibertaborgDry type transformer 10 / 0.4kV, etc.) operates normally. According to the AC current, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.Trondheim,Power transformer manufacturerThe input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times,LibertaborgOil immersed high voltage test transformer, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.How to reduce the failure of dry-type transformer?


LibertaborgGrounding resistance of distribution transformerPrinciples of Industry Allocation



If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Sales Department,Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer,LibertaborgQuotation of 315 KVA oil type transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, electrical components and insulating raw materials.Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.


LibertaborgGrounding resistance of distribution transformerPrinciples of Industry Allocation



The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Product survey,During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.Libertaborg,Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.Oil leakage at looper flangeThe insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms