Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

WeinamuSpot inspection standard for dry type transformerIntroduction of precautions

release time: 2022-12-04 17:39:10

() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.Weinamu,The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.Operation and maintenance management of oil immersed transformerKuala Lumpur,Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.Power transformer manufacturerThe scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?


WeinamuSpot inspection standard for dry type transformerIntroduction of precautions



High voltage fuse of transformer breaks one phase;Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound,WeinamuModel and meaning of oil immersed transformer, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition whether there is abnormal smell such as coke smell,Weinamu2000 dry type transformer manufacturer, we should also pay attention to the following aspects.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Create brilliance,Oil leakage of bolt or pipe external threadOil immersed transformer operationDue to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).


WeinamuSpot inspection standard for dry type transformerIntroduction of precautions



What is the reason for the shutdown of power transformer?Inspection items,On load commissioning:During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding that is, the disconnection component of the electric field is small.Weinamu,It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying the treatment goal can be achieved.The noise of dry-type transformer comes from

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms