Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

BayamarWhat are the test items of dry-type transformerThe three main aspects of unevenness

release time: 2024-04-27 20:06:17

the problem of dryness shall be solved. Generally

If the above provisions are not met, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Bayamar,When the output power P of the transformer is equivalent to the input power P, the efficiency & ETA; Equivalent, the transformer will not cause loss. But in fact, there is no such transformer. The electromagnetic energy of transformer always causes loss. The key of this kind of loss is copper loss and iron loss. Copper loss refers to the loss caused by the number of turns of transformer coil. When the current has a fever according to the number of turns of the coil, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer,BayamarMaintenance of oil immersed transformer, it is called copper loss.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Batgrām,In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction,BayamarSpot inspection standard for dry type transformer, chemical enterprises and factories.Analysis of common faults of oil immersed transformer:


BayamarWhat are the test items of dry-type transformerThe three main aspects of unevenness



Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a guardrail of no less than m shall be installed around it, and a warning sign shall be hung at a prominent position.analysis,For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the goal of long-term treatment of leakage can be achieved.When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, it is necessary to resolutely prevent the invasion of dirt such as rain snow, wind and sand.Direct materialWhen we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss. As early as the middle and late s, S Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb- and jb - Specifications operating in the power network at that time. Since the th century, urban power grids have been transformed all over the country, and S series distribution transformers have been used to replace S Series. In recent years, S and S commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China and their full load loss is % - % less than that of S transformer.Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.Bayamar,The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes,Bayamar4000 dry type transformer size, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.Analysis of common faults of oil immersed transformer:Analysis of common faults of oil immersed transformer:

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms