Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

BedgoshHousehold outdoor elevator on the third floorThe original design intention

release time: 2024-04-17 14:32:42

The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Bedgosh,Mine elevators are used for transporting personnel and goods in mines. Special elevators are designed for special environmental conditions, such as explosion-proof, anti-corrosion, and heat-resistant elevatorsMachine room power supply: The power supply should be three-phase V, and the lighting power supply should be single-phase V HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business,The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case including: home elevator manufacturersOpava, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab,BedgoshStage elevator, which should also be lengthened at the same time. After the escalator is extended, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.


BedgoshHousehold outdoor elevator on the third floorThe original design intention



Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.When encountering abnormal elevator operation, you can call the repair hotline to consult with the maintenance personnel or inform the service center to handle it. Do not take unauthorized measures to avoid causing greater harm to the elevator or even causing casualties.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersJob description,Measurement of elevator and escalator shafts (III)Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Household elevators must be regularly maintained to confirm their safety and whether they can continue to operate, while also repairing any faults and hidden dangers found.If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.Bedgosh,If the elevator is in a downward direction,BedgoshFully automatic reclaimer, immediately close the door and return to the first floor station, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Measurement of elevator and escalator shafts (III)


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms