Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

LondonRotating lifting stageTalk about the technical issues of installation and maintenance

release time: 2024-04-22 03:12:11

The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected,LondonAccessible lifting platform, refueled, dust is removed,As elevator people, let's talk about elevator and elevator safety knowledge: The elevators we currently use include box type passenger elevators, escalators, and dedicated cargo elevators. Dedicated cargo elevators are installed due to special needs, let's take a look at the safety knowledge of box type passenger elevators and escalators: When we take escalators, Be sure to follow the safety instructions when riding on the elevator. Do not crowd or play around, hold onto the elevator firmly, fasten your shoelaces, and avoid getting them caught up.The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Chitungwiza,Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams steel beams can be considered to be added between the frames for rectification.There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.


LondonRotating lifting stageTalk about the technical issues of installation and maintenance



The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.When encountering abnormal elevator operation, you can call the repair hotline to consult with the maintenance personnel or inform the service center to handle it. Do not take unauthorized measures to avoid causing greater harm to the elevator or even causing casualties.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).management,The requirement for the shaft is that it should not be plastered which is beneficial for reducing noise, but there should be no protruding foreign objects.The front room of the fire elevator is equipped with indoor fire hydrants.Electrical safety. Faulty elevators have multiple safety devices, but there are also many places where problems can occur. Some people have been caught due to abnormal door opening and closing, while others have encountered situations where elevator buttons malfunction and the display screen is black, making it difficult to see the floor clearly. Some have experienced the danger of falling straight several floors. Although there may not have been any personal injury, taking the elevator is not about finding or acting in a movie. The real life is disturbed by the frequent elevator accidents, which make my heart feel uneasy


LondonRotating lifting stageTalk about the technical issues of installation and maintenance



Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersCredit guarantee,Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.These phenomena are not elevator malfunctions. When the elevator is fully loaded, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss,LondonStage lifting platform, and there should be embedded steel plates.LondonThe safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.The front room of the fire elevator is equipped with indoor fire hydrants.Measure the length,LondonManufacturer of automatic flipper, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

If you think this entry needs to be improved, please edit

Previous Rhodes Support small conduitGood performance    Next TorenSupply fixed lifting platformHow to bend

Synonym

No synonyms