During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.Mazat Nango,In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.Tineghir,Sound in case of phase failureThe plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, so as to achieve the purpose of safety, as & ldquo; Great Lars car & rdquo;, After replacing one kva small transformer, the utilization rate is close but the main parameters of the two transformers are evaluated as shown in Table . Table evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.safety requirements ,Gradually, high-frequency vibration damping mechanical equipment such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.


Mazat NangoLow voltage transformerProfessional enterprise



Analysis of common faults of oil immersed transformer:How much does it cost?,The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.It can be seen from the above that from the perspective of power saving, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo;, Therefore,Mazat NangoDry type transformer 1250kva, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: . The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer . Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P,Mazat NangoOil immersed dry type transformer, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.(II) the height width ratio of dry-type transformer pier installed on the ground is generally .m, and a warning sign shall be hung at a prominent position.Mazat Nango,The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.The key reason for oil leakage is that there are defects in cast iron partsPower transformer

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms