Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it will be blocked by cement slurry during construction. At this time, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time,Gao WenAdvance grouting small conduit, we need to know that it is caused by the thin material selected. The above two points are common problems in the installation of grouting pipes that are not suitable for the current location. We&#;d better remember these points of attention, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceGao Wen, The concrete shall be evenly distributed, and the vibration shall be 'fast inserting and slow pulling' and slightly pumping up and down to make the concrete vibrate evenly. The vibration shall be carried out in sequence to avoid over vibration and missing vibration until the concrete surface is horizontal, no significant subsidence, no bubbles and no mortar on the surface. During vibration, the vibrating handle shall not touch the side formwork, grouting pipe, embedded parts, etc.General treatment method: first, yze what causes the pipe blockage. For the pipe blockage of hard objects, you can poke with steel bars according to the depth, or bind a slightly thicker steel bar with steel wire rope. For the pipe blockage of soft objects you can use the air compressor pipe to open the air compressor for blowing. Be sure to note that the water in the pipe may rush up like a fountain to pour water all over you! If it is slurry leakage and pipe plugging, there is no way to open it. We can only communicate with the testing personnel to change a testing method, such as low strain and core drilling method! Other uses of the grouting pipe: in addition to being used as a detection channel and replacing part of the reinforcement section, the grouting pipe can also be used as a pipe for grouting at the bottom of the pile. Experiments have proved that the bearing capacity of the cast-in-place pile treated with the grouting at the bottom of the pile can be greatly improved. At the same time, the grouting pipe can also be used as a channel for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch through the pipe at the defective part to be grouted. Grouting pipe is specialized in the production of grouting pipe (ultrasonic detection pipe) for bridge pile foundation inspection. The product conforms to the industrial standard steel thin-walled grouting pipe for concrete cast-in-place pile and its use requirements (JT / T - which was tried out by the Ministry of communications of the people&#;s Republic of China on April , It can not only meet the requirements of the standard, and obtain the inspection report of Hebei Road and Bridge Inspection Center.KofarnihonThere are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe, the deformation compensation of the pipe system can be determined according to these relatively simple pipe sections, so as to select the grouting pipe.The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter. The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order.


Gao WenSeamless small conduitStability force in structural design



Two convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, a rubber sealing ring is deformed and pasted between two layers of pipes and then the connection of the product is completed; After being kneaded, which plays a double safety sealing effect.The cement grouting method is applicable to the grouting of gravel layer and rock fissure. Ordinary portland cement is generally used, the water cement ratio is :, and % ~ % water glass can be added as the accelerator. Ordinary extrusion mortar pump is used for grouting, split grouting can be adopted. The consistency of the cement slurry used for split grouting is large, and the water cement ratio is . ~ .. Flower tube method and one-way valve tube method are adopted for grouting. The maximum pressure of grouting is generally greater than MPa.If any crack is found, it shall be repaired in time, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available, the method of hot vulcanization connection can be used.?planThe grouting pipe at the tensioning end has good anchoring energy and self anchoring energy. Grouting pipe is generally used for tensioning. The grouting pipe at the tensioning end is composed of four parts: clip, anchor plate, anchor base plate and spiral reinforcement. The clip is the key part of the anchoring system. It is two-piece and made of high-quality alloy steel.The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.Answer: it varies according to the model and elasticity of the grouting pipe, and its internal pressure can reach bar or more.


Gao WenSeamless small conduitStability force in structural design



The longitudinal overlapping width of grouting pipe and grouting pipe shall not be less than cm, and the transverse overlapping width shall not be less than cm. The former shall be placed on the latter according to the asphalt paving direction. After laying the glass fiber grouting pipe, fix the glass fiber grouting pipe with high-quality cement nails and fixed iron sheets with a size of mm, mm and a thickness of .mm. The fixed spacing can be determined according to the actual construction situation.Inspection environment,Gao WenTunnel small conduit,The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption,Gao WenSmall conduit support, it is OK if the pipe wall can bear the lateral pressure of new concrete, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?Gao Wen,Answer: Yes, it can be protected. The piston rod can be protected by adding plastic hoses or bellows within the travel range.The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.How heavy is a grouting pipe?