Create entry
World Encyclopedia  > category  >  Building Materials Encyclopedia   

Kielmanufacturer of composite anchor rodAnalytical principle of frequency conversion energy saving

release time: 2024-04-08 03:31:42

The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, the internal pressure grouting pipe can be displaced in three directions, but because it is limited by casing and other accessories it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, vibration reduction and noise reduction, which can reduce the deformation of the pipe and improve the service life of the pipe.Kiel, Non woven filter cloth layer outside the framework. Only water and grout are allowed to pass through and other materials such as cement slurry in concrete are blocked outside the grouting pipe to ensure smooth use of the whole section of the grouting pipe. Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?Loei,At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.Two convex grooves are planned at the end of the bell end of the double seal clamp grouting pipe, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes, which plays a double safety sealing effect.


Kielmanufacturer of composite anchor rodAnalytical principle of frequency conversion energy saving



It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in China specification: inner diameter of disposable grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: ± .mm; Length of each roll: m. Inner diameter of repetitive grouting pipe: mm; Outer diameter: mm Inner diameter tolerance: ± .mm; Length of each roll: m.The Xiaobian of prestressed machines and tools reminds us that there are many forms of grouting pipes, which can be distinguished from different angles, including the following. According to the type of reinforcement of the grouting pipe, it can be divided into the grouting pipe of thick reinforcement of the grouting pipe, a grouting pipe must anchor several steel bars or steel strands at the same time one grouting pipe is generally used to anchor one reinforcement. For tendons and steel strands, which are often arranged in a ring or circle, or in a rectangle. Obviously, due to the different number and arrangement of prestressed reinforcement, the form and structure of grouting pipe will also be different. According to the principle of grouting pipe and transmitting pretension, it can be divided into grouting pipe relying on bearing pressure,KielDouble layer small conduit advance support, grouting pipe relying on friction and grouting pipe relying on adhesion.Information recommendation,Disposal method: the grouting pipe shall be shortened according to the specification. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.


Kielmanufacturer of composite anchor rodAnalytical principle of frequency conversion energy saving



It has good flexibility. The pipes can be coiled when they are produced, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.Potential development, The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface. Determine the specific requirements of grouting test and test the test effect. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.Kiel, The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular, attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, every link of the installation must be carefully operated. At the same time, the steel purlin must also ensure its stability strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal,KielGrouting anchor,KielGrouting small conduit, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes?When the grouting pipe is installed, the axis deviation shall be ≤ cm, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms