Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

HejinDouble column aluminum alloy lifting platformWhat are the product performance and advantages

release time: 2024-04-29 02:24:34

Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.If the elevator is in a downward direction, immediately close the door and return to the first floor station, and automatically open the elevator door.Hejin,Elevator does not close the door or repeatedly opens and closes the door: there are debris blocking the light curtain or door contact plate at the entrance or sill.  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, etc. can meet the installation requirements of the elevator, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.Janin,There are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).There is a dedicated fire telephone in the fire elevator car.


HejinDouble column aluminum alloy lifting platformWhat are the product performance and advantages



Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis,HejinSmall household micro elevator, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Mine elevators are used for transporting personnel and goods in mines. Special elevators are designed for special environmental conditions, such as explosion-proof, anti-corrosion, and heat-resistant elevatorsThe front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling shutters with stopping function.Safety production,Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams steel beams can be considered to be added between the frames for rectification.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, someone is also responsible.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform,HejinVilla Home Elevator, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


HejinDouble column aluminum alloy lifting platformWhat are the product performance and advantages



The front room of the fire elevator is equipped with indoor fire hydrants.Online consultation,Measurement of elevator and escalator shafts (III). Different types of civil engineering traction elevators, screw elevators, and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space, which can be made of concrete, steel structure hoistways, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally, there are certain requirements for the height of the top floor.When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Hejin, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise,HejinSelf walking aluminum alloy lifting platform, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, and on the other hand the maintenance technology and quality are guaranteed, if any problems occur, someone is also responsible.


Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms