Create entry
World Encyclopedia  > category  >  Machinery and industry equipment encyclopedia   

MoralesHigh current transformerAdvantages of industry development

release time: 2023-01-23 21:09:26

Power transformer plantA specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?MoralesAt that time, only a few companies in China could produce kV high-voltage transformers,Morales22kv power transformer, and the market share of high-voltage transformers was basically monopolized by overseas leaders.The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.Yangiyul,If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Connection group structure of dry-type transformerBrief introduction of zero line of power transformer


MoralesHigh current transformerAdvantages of industry development



Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.Operation of oil immersed transformerHonesty is the foundation,Wiring mode of dry-type transformer:Noise pollution control and prevention measures of dry-type transformerDuring no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.


MoralesHigh current transformerAdvantages of industry development



It includes the performance and main uses of insulating layer materials, various insulating layer parts component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core,MoralesInsulation grade of oil immersed transformer, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.Installation materials,Careless maintenance and insulation damageIn order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.The method and whole process of taking oil sample of power transformer are as follows:Morales, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm,MoralesOutline dimensions of 2500kVA dry type transformer, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

Attachment list


0

The content of the entry is for reference only. If you need to solve a specific problem (especially in the fields of law, medicine, etc.), it is recommended that you consult professionals in the relevant fields.

Synonym

No synonyms